Questions? +1 (202) 335-3939 Login
Trusted News Since 1995
A service for auto industry professionals · Saturday, February 22, 2025 · 788,244,816 Articles · 3+ Million Readers

TDOT Lane Closure Report for Middle Tennessee, Feb. 20-26, 2025

Click here to subscribe to the Region 3 Lane Closure Report

DAVIDSON COUNTY I-24
Sign replacement.
• Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures on I-24 in both directions for flat sheet sign replacement (MM 28 – 40).
Sensor installation.
• Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures on I-24 in both directions for Mainline Weigh In Motion Program sensor installation (MM 34 – 34.4).
SmartWay Intelligent Transportation Maintenance.
• 2/20, 8 p.m. – 5 a.m., There will be a double right lane closure on I-24 westbound for sensor replacement (MM 48).
• 2/26, 8 p.m. – 5 a.m., There will be a triple right lane closure on I-24 westbound for sensor replacement (MM 57.2 – 59.2).

DAVIDSON AND RUTHERFORD COUNTIES I-24
Survey and drainage operations.
• Nightly, 8 p.m. – 5 a.m., There will be double inside lane closures on I-24 in both directions for survey, drain cleaning, drilling, and drainage structure inspection work (MM 52 – 75.5).

RUTHERFORD COUNTY I-24
The resurfacing on I-24 from near the Stones River to east of the CSXT Railroad.
• Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures in both directions for paving activities (MM 78 – 82).
Survey and drainage operations.
• Nightly, 8 p.m. – 5 a.m., There will be inside lane closures on I-24 in both directions for survey, drain cleaning, and drainage inspection work (MM 71 – 75.5).

HUMPHREYS COUNTY I-40
SmartWay Intelligent Transportation Maintenance.
• Nightly, 8 p.m. – 6 a.m., There will be a temporary right lane closure on I-40 eastbound for the installation of fiber. One lane will remain open at all times.
The repair of bridges on I-40 over Squeeze Bottom Road and Buffalo River Bridge.
• Nightly, 7 p.m. – 5 a.m., There will be temporary lane closures on I-40 in both directions for roadway maintenance as needed. One lane will always remain open (MM 140 – 142).

DAVIDSON COUNTY I-40
SmartWay Intelligent Transportation Maintenance.
• Nightly, 8 p.m. – 5 a.m., There will be a double right lane closure on I-40 eastbound for sensor replacement (205.2 – 207.2).
• 2/23, 12 a.m. – 8 a.m., There will be double and triple right lane closures on I-40 in both directions for sensor replacement (MM 210.2 – 212.2).
Harpeth River Bridge Repair.
• Daily 9 a.m. – 3 p.m. and Nightly 8 p.m. – 5 a.m., There will be lane closures in both directions on I-40 for repairs of the bridge over the Harpeth River (MM 194 – 196).
I-40/12th Avenue Bridge Repair.
• Nightly, 9 p.m. – 5 a.m., There will be a single lane closure on I-40 westbound under 12th Avenue for bridge construction activities (MM 209). There may be double lane closures on I-40 westbound at various times for the work.
• 2/23, 8 p.m. – 5 a.m., 12th Avenue will close to prepare for a 40-day lane shift over I-40 for repair work.
• LOOK AHEAD: 3/7 – 3/10, Continuous, There will be a weekend lane closure on I-40 westbound. The I-40 westbound ramp from I-65 north will be closed along with I-40 westbound Exit 210A.
Grading, drainage, and construction at Donelson Pike Interchange (MM 214.4 – 218).
• 2/24 – 2/26, Daily, 1 p.m., There will be rolling roadblocks in both directions on I-40 for blasting.
• Nightly, 8 p.m. – 4 a.m., There will be alternating triple right and left lane closures on I-40 in both directions for bridge work and repair.
Survey and drainage operations.
• Nightly, 8 p.m. – 5 a.m., There will be double lane closures on I-40 in both directions for survey, drain cleaning, and drainage structure inspection work (MM 212.4 – 216).

DAVIDSON COUNTY I-40/I-65
Hot chocolate run.
• Sunday 2/23, 7 a.m. – 11 a.m., The off-ramps for exits 209 (Church St./Charlotte Ave.) and 209A (Church St.) will be closed in both directions for a run in downtown Nashville.

DAVIDSON AND WILSON COUNTIES I-40
Sign replacement.
Nightly, 8 p.m. – 5 a.m., There will be a mobile left lane closure on I-40 in both directions for median wall sign replacement (MM 195 – 236).

WILSON COUNTY I-40
Blasting.
• 2/24 and 2/26, Daily, 11 a.m., There will be a rolling roadblock on I-40 between the I-840 and HWY 231 for blasting (MM 235 – 238).

DAVIDSON COUNTY I-440
Survey and drainage operations.
• Nightly, 8 p.m. – 5 a.m., There will be double lane closures on I-440 in both directions and includes the I-24/I-440 interchange for survey, drain cleaning, and drainage structure work (MM 7 – 7.5).

DAVIDSON AND ROBERTSON COUNTIES I-65
Sign replacement.
• Nightly, 8 p.m. – 5 a.m., There will be a rolling left lane closure on I-65 northbound for median wall sign replacement (MM 60 – 97).

MAURY COUNTY I-65
Aerial fiber installation at Saturn Parkway.
• 2/23, 6 a.m. – 9 a.m., There will be a rolling roadblock for aerial fiber installation in both directions on I-65 (MM 52.31).

MAURY AND WILLIAMSON COUNTIES I-65
Striping operations.
• 2/26, 8 p.m. – 6 a.m., There will be mobile operations to restripe the right lane on the ramp from SR 396 eastbound to I-65 northbound (MM 53).

DAVIDSON COUNTY SR 1
Pavement repairs.
• 2/20 – 3/6, Daily, 9 a.m. – 3 p.m., There will be lane closures and shifts along SR 1 for pavement repair (MM 13.25).
• 2/20 8 p.m. – 5 a.m. and 2/21 8 p.m. – 2/23 12 p.m. (continuous), There will be a lane shift on the northbound/West End/70-S exit to I-440 eastbound on the ramp to repair damaged concrete (MM 14.8 – 15). Ramps will remain open.

DAVIDSON COUNTY SR 11
The widening of US 31A (SR 11, Nolensville Pike) from North of the Mill Creek bridge to SR 254 (OHB) including bridges, retaining walls, signals, and lighting.
• Continuous, Holt Road will be closed to thru traffic until summer 2025. A detour is in place.
• Daily, 9 a.m. – 3 p.m., There will be temporary road closures on SR 11 and associated side roads for utility relocation, grading, and drainage.
Valve Repair.
• Nightly, 8 p.m. – 5 a.m., Lane closures along SR 11 for repair work at 3901 Nolensville Pike (MM 7.58).
Gas line maintenance.
• Nightly, 8 p.m. – 5 a.m., Lane closures along SR 11 to install gas lines (MM 19.46 – 19.52).

DAVIDSON COUNTY SR 155
Pole replacement.
• Nightly, 8 p.m. – 5 a.m., There will be lane closures in both direction on SR 155 for pole replacement (MM 5.16 – 5.82).
Sign replacement.
• Nightly, 8 p.m. – 5 a.m., There will be a left lane closure on SR 155 for flat sheet sign replacement (MM 6.2 – 27).
Water line maintenance.
• Nightly, 8 p.m. – 5 a.m., There will be lane closures on SR 155 White Bridge Pike for water and sewer line maintenance (MM 28.32 – 28.39).

DAVIDSON COUNTY SR 255
The grading, drainage, construction of bridges, retaining walls and paving on SR 255 over I-40 at the Donelson Pike interchange.
• Daily, 9 a.m. – 3 p.m., There will be alternating lane closures on Donelson Pike for grading and utility work (MM 216).

DAVIDSON COUNTY SR 386
Sign replacement.
• Nightly, 8 p.m. – 5 a.m., There will be left lane closures on SR 386 eastbound for flat sheet sign replacement (MM 1.6 – 4.2).

DAVIDSON COUNTY SR 45
Pavement repair.
• Daily, 9 a.m. – 3 p.m., There will be various lane closures on SR 45 for pavement repair (MM 0 – 17.94).

DAVIDSON COUNTY SR 6
Conduit.
• Nightly, 8 p.m. – 5 a.m., There will be lane closures along SR 6 to access manholes to place fiberoptics in existing conduit at 8th Avenue South at South Street (MM 7.88 – 7.89).
Fiberoptic install.
• Nightly, 8 p.m. – 5 a.m., There will be lane closures to install fiberoptic cables at the intersection of SR 6 and SR 24 (Broadway and Rosa L. Parks Blvd.) (MM 8.44 – 8.54 and MM 12.24).
• Nightly, 8 p.m. – 5 a.m., There will be lane closures on SR 6 Gallatin Pike South for fiber installation at Woodruff Street going south to Gallatin Pike South at Briley Parkway (MM 16.64 – 18.34).

DAVIDSON COUNTY SR 65
Gas line maintenance.
Nightly, 8 p.m. – 5 a.m., Lane closures on SR 65 for installation of gas lines crossing SR 65 at 407 West (Trinity Lane) (MM 0.86 – 0.96).

DICKSON COUNTY SR 46
The construction of a box beam bridge on SR 46 over Yellow Creek.
• Daily, The bridge will be reduced to one lane in order to demo the existing structure and reconstruct the new bridge. Traffic will be controlled by temporary signals.

MONTGOMERY COUNTY SR 112 / SR 76
Intersection Improvements, grading, drainage, and construction of retaining walls.
• Daily, 9 a.m. – 3 p.m., There will be temporary lane closures for utility relocation, grading, and drainage installation (MM 9.19 – 9.41 and MM 14.1 – 14.2).

MONTGOMERY COUNTY SR 374
Cable barrier work.
• Nightly, 8 p.m. – 6 a.m., There will be an inside lane closure on 374 westbound between Peacher’s Mill Road and Whitfield Road.

RUTHERFORD COUNTY SR 99
The grading, drainage, construction of retaining walls, signals and paving on SR 99 (New Salem Hwy) from near I-24 to SR 96 (Old Fort Pkwy).
• Daily, 9 a.m. – 3 p.m., There will be periodic flagging operations for construction activities.

RUTHERFORD COUNTY SR 266
The grading, drainage, and construction of two concrete bulb tee beam bridges, signals, and paving on SR-266 (Jefferson Pike) from SR 102 to east of I-840.
• Daily, 9 a.m. – 3 p.m., There will be periodic flagging operations for construction activities (MM 5 – 9).

SUMNER COUNTY SR 6
The resurfacing on US 31E (SR 6) from near Greensboro Drive to south of Joann Street.
• Daily, 9 a.m. – 3 p.m., There will be intersection flagging for pavement marking installation on side streets.
• Nightly, 8 p.m. – 5 a.m., There will be lane closures in both directions for final pavement markings.
Pavement repair.
• Daily, 9 a.m. – 3 p.m., There will be various lane closures along SR 6 for pavement repair (MM 0 – 37.76).

WILLIAMSON COUNTY SR 106
Hillsboro Road intersection improvements for SR 106 intersection.
• Daily, 9 a.m. – 3 p.m., There will be intermittent lane closures on the SR 106 intersection with SR 46 for grading work.

WILLIAMSON COUNTY SR 246
Pothole patching.
• Daily, 9 a.m. – 3 p.m., There will be various lane closures in both directions for pothole patching (MM 0 -2.89).

WILSON COUNTY SR 24
Pothole patching.
• Daily, 9 a.m. – 3 p.m., There will be various lane closures in both directions for pothole patching (MM 0 – 27.25).

 

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity. Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather. From your desktop or mobile device, get the latest construction activity and live streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 from any land-line or cellular phone for travel information, or follow us on Twitter at www.twitter.com/TN511 for statewide travel. As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination. Drivers should never tweet, text or talk on a cell phone while behind the wheel.
 

Powered by EIN Presswire

Distribution channels:

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.